17 September 2014
FireWare has been working with a new repair system since mid-2014. RMA forms, a more spacious Technical Department and a new storage system ensure order and speed.
The relocation of FireWare to Stek 5 in Wieringerwerf was the perfect opportunity to realize a new layout for the Technical Department. A spacious repair area has been built with a new storage system allowing orderly and efficient work.